New Jersey · Statewide
New Jersey Electrical Equipment Buyers
We purchase switchgear, generators, transformers, bus duct, panelboards, breakers, MCCs and copper cable across New Jersey, and we perform the de-energized removal ourselves.
318 cities- State
- New Jersey
- Cities
- 318
- Utilities
- PSE&G, JCP&L, Atlantic City Electr
- Corridors
- I-95, the Turnpike, I-287, I-78 an
- Offer
- Same business day
- Phone
- 954-740-1983
Plate 01
How New Jersey jobs actually run
Utility territory matters here more than most owners expect: PSE&G, JCP&L, Atlantic City Electric each have their own disconnect and metering process, and the sequence of who de-energizes what is usually the longest lead item on the schedule.
Freight is the other half. We route New Jersey work along I-95, the Turnpike, I-287, I-78 and I-80, which is what keeps trailer and crew cost predictable on a quote instead of padded.
Chemical and pharmaceutical plants along the Turnpike corridor plus dense urban building renovations make New Jersey one of our highest-volume states for switchboards, busway risers and MV switchgear.
Primary hubs
Newark, Secaucus, Weehawken, Piscataway and Cherry Hill — but coverage is statewide, including rural substation and mine sites.
Plate 02
What we buy in New Jersey
Electrical Switchgear
We buy low- and medium-voltage switchgear line-ups out of live plants, substations and buildings scheduled for demolition — metal-clad, metal-enclosed, drawout and fixed-mount.
480 V – 38 kV, up to 5,000 AGenerators
Diesel and natural-gas gensets from 100 kW through 3 MW — enclosed, open-skid, trailer-mounted and sub-base tank units, with or without their transfer switches.
100 kW – 3 MW diesel and gasTransformers
Pad-mount, dry-type, cast-coil, unit substation and liquid-filled power transformers from 75 kVA through 50 MVA, including units still energized on the pad.
75 kVA – 50 MVABus Plugs
Fusible and circuit-breaker bus plugs by the unit or by the pallet — 30 A through 1,200 A, all major busway systems, any vintage.
30 A – 1,200 A fusible and breakerBus Duct & Busway
Plug-in and feeder busway runs, elbows, tees, end boxes and cable-tap sections — copper or aluminum, 225 A through 5,000 A, removed by our own crews.
225 A – 5,000 A runsPanelboards & Switchboards
Panelboards, switchboards, distribution panels, safety switches and disconnects — loaded with breakers or empty, one panel or a whole building's worth.
100 A – 4,000 AWire & Cable
Surplus and reclaimed copper and aluminum wire and cable — full spools, partial spools, off-spool coils and cable pulled out of cancelled jobs.
#12 AWG – 1,000 MCMLoad Banks
Resistive and resistive/reactive load banks — portable, trailer-mounted, roof-top and permanently installed, 100 kW through 3 MW.
100 kW – 3 MW resistiveCircuit Breakers
Molded-case, insulated-case, low-voltage power and medium-voltage vacuum and air-magnetic breakers — single units, pallets and full sets pulled from a line-up.
15 A – 6,000 A framesMotor Control Centers
Complete MCC line-ups, individual vertical sections, starter buckets and VFD sections — low voltage and medium voltage, any generation.
MCC line-ups, buckets, VFD sectionsSubstations
Complete unit substations and outdoor station equipment — primary switch, transformer, secondary switchgear, structures, bus and relaying, bought as one lot.
Complete unit and station substationsTransfer Switches
Automatic and manual transfer switches, bypass-isolation switches and paralleling gear, 100 A through 4,000 A, pulled with or without their generators.
100 A – 4,000 A ATSCapacitors & Power Quality
Fixed and automatically switched capacitor banks, harmonic filters, reactors and power-factor correction equipment, indoor and outdoor.
50 kVAR – 10 MVARComplete Plant Lots
When a plant closes, we buy the entire electrical scope as one lot — substation to receptacle — and we do the teardown and loading at our cost.
Whole-facility electrical scopePlate 03
All 318 New Jersey cities we cover
Plate 04
Buyer desks
Plate 05
New Jersey questions
What happens to the equipment after you buy it?
Serviceable gear is tested, reconditioned where needed and resold as replacement equipment — that resale is what funds your offer. What cannot go back into service is dismantled for copper, aluminum and steel recovery through permitted processors, with regulated fractions documented.
Do you buy equipment that is still energized and in service?
Yes, and most of what we buy is. We quote it now and remove it on your cutover date. Telling us at the quote stage which New Jersey assets are still live lets us build the phasing and the clearance coordination into the schedule from the beginning.
Our electrical room is in a basement with a tight door. Is that a problem?
It is routine. Switchgear sections, transformers and gensets frequently have to be cut down or partially disassembled to clear a door width, an elevator limit or a stair turn. The access survey at your New Jersey site establishes the path before we commit to a date, and that cost is already inside the offer.
Will you take the equipment we cannot sell along with the good items?
Yes, and this is usually why sellers choose us. Cherry-picking leaves you holding the leftovers of the leftovers. We price the New Jersey lot as a whole — good gear, obsolete gear and the scrap fraction together — so the electrical room ends up genuinely empty.
Do you provide documentation for surplus property or audit records?
Yes. Itemized purchase agreements, weight tickets, bills of lading, oil disposal manifests and recycling documentation are standard on New Jersey purchases. Public agencies and audited facilities get the paperwork their process requires without having to ask twice.
Form 1 — Request for Offer
Get a Written Offer
Send the asset list, or just describe what is in the room. We come back the same business day with a written, itemized offer.
Faster: call or text 954-740-1983
Email an asset list to electricalequipmentbuyers@gmail.com
Mon–Sat, 7am–7pm ET. We never resell your contact information.
Equipment sitting in New Jersey?
Send photos or a list. We reply the same business day.