Panelboards, switchboards, distribution
Panelboards & Switchboards: What We Buy and What It Is Worth
Panelboards, switchboards, distribution panels, safety switches and disconnects — loaded with breakers or empty, one panel or a whole building's worth.
100 A – 4,000 A- Offer
- Same business day
- Payment
- Before load-out
- Removal
- Our crews, our rigging
- Insurance
- COI on request
- Coverage
- All 50 states
- Desk
- 954-740-1983
Plate 01
Panelboards & Switchboards: the specification
What we take
Lighting and distribution panelboards, I-Line and equivalent bolt-on panels, front-accessible and rear-connected switchboards, main breaker and main lug panels, meter stacks, fused and non-fused safety switches, and loose breakers by the box. Discontinued panels with hard-to-find interiors are especially worth calling about.
What sets the number
Interior style, bus rating and breaker population. A panel full of current bolt-on breakers is worth well more than the enclosure it sits in — breakers are the value. Obsolete interiors that no one manufactures still command real money as replacement stock. Rusted enclosures with burned bus price as copper, aluminum and steel.
How we get it out
Panels come off the wall or out of the electrical room after lockout. We pull the feeders back to the gland, unbolt, carry out and load. Multi-floor buildings are routine; we stage by floor and pull to the dock.
| Item | Detail |
|---|---|
| Ratings | 100 A – 4,000 A |
| Scope | Panelboards, switchboards, distribution |
| Nameplates | Square D NQOD & I-Line, GE, Siemens, Eaton, Cutler-Hammer, Federal Pacific, Zinsco, Westinghouse, Murray, Challenger |
| Condition | Working, retired, water-damaged or already dismantled |
| Minimum | One section, one unit, or a whole plant lot |
Plate 03
Field notes on this equipment
Panelboards, switchboards and the value line between them
Distribution panels, switchboards and load centers: which carry resale value, which are copper plays, and how breaker content changes the math.
ValuationCampus electrical projects run on a summer clock
How school districts and universities time electrical upgrades, what equipment comes out, and why the summer window changes the economics of a sale.
SectorsPlate 04
Panelboards & Switchboards by city
We publish a dedicated page for this equipment in every major metro, and general coverage in all 7,518 cities.
Form 1 — Request for Offer
Get a Written Offer
Send the asset list, or just describe what is in the room. We come back the same business day with a written, itemized offer.
Faster: call or text 954-740-1983
Email an asset list to electricalequipmentbuyers@gmail.com
Mon–Sat, 7am–7pm ET. We never resell your contact information.
Selling electrical panels?
Nameplate photos are enough to start. Written offer the same business day.