Skip to content

Georgia · Statewide

Georgia Electrical Equipment Buyers

We purchase switchgear, generators, transformers, bus duct, panelboards, breakers, MCCs and copper cable across Georgia, and we perform the de-energized removal ourselves.

Electrical equipment load-out in Georgia200 cities
State
Georgia
Cities
200
Utilities
Georgia Power, Georgia EMC, MEAG
Corridors
I-75, I-85, I-20 and I-285
Offer
Same business day
Phone
954-740-1983

Plate 01

How Georgia jobs actually run

Utility territory matters here more than most owners expect: Georgia Power, Georgia EMC, MEAG each have their own disconnect and metering process, and the sequence of who de-energizes what is usually the longest lead item on the schedule.

Freight is the other half. We route Georgia work along I-75, I-85, I-20 and I-285, which is what keeps trailer and crew cost predictable on a quote instead of padded.

Carpet, poultry and automotive plants across north Georgia plus the Savannah port corridor produce a steady flow of MCC line-ups, busway and dry-type transformers.

Primary hubs

Atlanta, Douglasville and Savannah — but coverage is statewide, including rural substation and mine sites.

Plate 02

What we buy in Georgia

Electrical Switchgear

We buy low- and medium-voltage switchgear line-ups out of live plants, substations and buildings scheduled for demolition — metal-clad, metal-enclosed, drawout and fixed-mount.

480 V – 38 kV, up to 5,000 A

Generators

Diesel and natural-gas gensets from 100 kW through 3 MW — enclosed, open-skid, trailer-mounted and sub-base tank units, with or without their transfer switches.

100 kW – 3 MW diesel and gas

Transformers

Pad-mount, dry-type, cast-coil, unit substation and liquid-filled power transformers from 75 kVA through 50 MVA, including units still energized on the pad.

75 kVA – 50 MVA

Bus Plugs

Fusible and circuit-breaker bus plugs by the unit or by the pallet — 30 A through 1,200 A, all major busway systems, any vintage.

30 A – 1,200 A fusible and breaker

Bus Duct & Busway

Plug-in and feeder busway runs, elbows, tees, end boxes and cable-tap sections — copper or aluminum, 225 A through 5,000 A, removed by our own crews.

225 A – 5,000 A runs

Panelboards & Switchboards

Panelboards, switchboards, distribution panels, safety switches and disconnects — loaded with breakers or empty, one panel or a whole building's worth.

100 A – 4,000 A

Wire & Cable

Surplus and reclaimed copper and aluminum wire and cable — full spools, partial spools, off-spool coils and cable pulled out of cancelled jobs.

#12 AWG – 1,000 MCM

Load Banks

Resistive and resistive/reactive load banks — portable, trailer-mounted, roof-top and permanently installed, 100 kW through 3 MW.

100 kW – 3 MW resistive

Circuit Breakers

Molded-case, insulated-case, low-voltage power and medium-voltage vacuum and air-magnetic breakers — single units, pallets and full sets pulled from a line-up.

15 A – 6,000 A frames

Motor Control Centers

Complete MCC line-ups, individual vertical sections, starter buckets and VFD sections — low voltage and medium voltage, any generation.

MCC line-ups, buckets, VFD sections

Substations

Complete unit substations and outdoor station equipment — primary switch, transformer, secondary switchgear, structures, bus and relaying, bought as one lot.

Complete unit and station substations

Transfer Switches

Automatic and manual transfer switches, bypass-isolation switches and paralleling gear, 100 A through 4,000 A, pulled with or without their generators.

100 A – 4,000 A ATS

Capacitors & Power Quality

Fixed and automatically switched capacitor banks, harmonic filters, reactors and power-factor correction equipment, indoor and outdoor.

50 kVAR – 10 MVAR

Complete Plant Lots

When a plant closes, we buy the entire electrical scope as one lot — substation to receptacle — and we do the teardown and loading at our cost.

Whole-facility electrical scope

Plate 03

All 200 Georgia cities we cover

AcworthAdairsvilleAdelAlbanyAlpharettaAmericusAshburnAthensAtlantaAuburnAugustaAustellBainbridgeBaldwinBarnesvilleBaxleyBelvedere ParkBemissBlakelyBraseltonBremenBrookhavenBrunswickBuckheadBufordByronCairoCalhounCamillaCandler-McAfeeCantonCarrolltonCartersvilleCedartownCentervilleChambleeChatsworthChattanooga ValleyClarkstonCochranCollege ParkColumbusCommerceConleyConyersCordeleCorneliaCountry Club EstatesCovingtonCummingCussetaDaculaDahlonegaDallasDaltonDawsonDawsonvilleDecaturDock JunctionDoravilleDouglasDouglasvilleDruid HillsDublinDuluthDunwoodyEast PointEastmanEatontonElbertonEuharleeEvansFair OaksFairburnFairfield PlantationFairviewFayettevilleFitzgeraldFlowery BranchFolkstonForest ParkForsythFort OglethorpeFort StewartFort ValleyGainesvilleGarden CityGeorgetownGlennvilleGraysonGresham ParkGriffinGrovetownHamptonHapevilleHartwellHawkinsvilleHazlehurstHeron BayHinesvilleHiramHolly SpringsHoschtonIrondaleJacksonJasperJeffersonJesupJohns CreekJonesboroKennesawKingslandLaFayetteLaGrangeLakeviewLawrencevilleLilburnLindaleLithia SpringsLocust GroveLoganvilleLovejoyLyonsMabletonMaconMadisonMariettaMartinezMcDonoughMcRae-HelenaMilledgevilleMiltonMonroeMontgomeryMorrowMoultrieMountain ParkNashvilleNewnanNorcrossNorth DecaturNorth Druid HillsOakwoodPalmettoPanthersvillePeachtree CityPeachtree CornersPerryPoolerPort WentworthPowder SpringsQuitmanRedanRichmond HillRinconRiverdaleRockmartRomeRoswellSandersvilleSandy SpringsSavannahScottdaleSenoiaSkidaway IslandSmyrnaSnellvilleSocial CircleSouth FultonSt. MarysSt. SimonsStatesboroStockbridgeStone MountainStonecrestSugar HillSummervilleSuwaneeSwainsboroSylvesterTempleThomastonThomasvilleThomsonTiftonToccoaTuckerTyroneUnion CityValdostaVidaliaVilla RicaViningsWarner RobinsWaycrossWaynesboroWhitemarsh IslandWilmington IslandWinderWoodstock

Plate 05

Georgia questions

Do we have to disconnect the equipment before you arrive?

No. We handle removal. Your electrician or the utility performs the final isolation and we verify it; from there our crews lock out, cut and cap cable at the gland, unbolt the sections, skate them out and load them. If the Georgia room is still partly live we phase the work.

How do you handle transformer oil in Georgia?

Oil is tested, drained and manifested through licensed handlers, and you receive the documentation with your paperwork. PCB-suspect units go under a separate waste profile. Nothing is left on your pad in Georgia and nothing gets dumped — the handling cost is already in the offer.

When do we get paid?

Before the equipment leaves your Georgia dock. Wire, company check or cashier's check, whichever your accounting group prefers. On large phased projects we pay per load as it ships rather than holding everything until the end.

What if the equipment is old or has no test records?

We still quote it. Records raise the number — a NETA test report on a breaker or a transformer is the single document that most improves what we can pay — but their absence disqualifies nothing. We price Georgia equipment on what our technicians and the replacement market say it is worth.

Are you insured to work inside our Georgia facility?

Yes. We carry general liability, auto, workers' compensation and umbrella coverage, and we issue a certificate naming your entity as additional insured before crews mobilize to Georgia. We also complete vendor onboarding, background checks and site-specific safety orientation on request.

Form 1 — Request for Offer

Get a Written Offer

Send the asset list, or just describe what is in the room. We come back the same business day with a written, itemized offer.

Faster: call or text 954-740-1983
Email an asset list to electricalequipmentbuyers@gmail.com
Mon–Sat, 7am–7pm ET. We never resell your contact information.

Equipment sitting in Georgia?

Send photos or a list. We reply the same business day.

954-740-1983

Mon–Sat, 7am–7pm ET · Georgia statewide

Get a Written Offer