Skip to content

Quote · Disconnect · Rig · Pay

Tice, FL Industrial Electrical Equipment Purchase and Removal

Pulling electrical gear out of a Tice facility normally takes three vendors: an electrician to de-energize, a rigger to move the heavy sections, and a hauler to get it off site. Coordinating three trades around one outage window is where these projects go sideways. We collapse all three into one contract and pay you for the equipment on top of it.

Electrical equipment removal in Tice, FLFlorida · statewide
Location
Tice, FL
State
Florida
Utilities
FPL, Duke Energy Florida, TECO,
Offer
Same business day
Payment
Before load-out
Phone
954-740-1983

Plate 01

Buying electrical equipment in Tice

Coverage in Tice is run off our Florida routing along I-95, I-75, I-4 and the Turnpike. Coordination with FPL, Duke Energy Florida, TECO, JEA on clearances, metering removal and final disconnect is part of the scope, not a change order. Hurricane-season generator turnover keeps standby sets and transfer switches moving through Florida year-round, and phosphate, citrus and power-plant retirements add transformers and MV switchgear. Our purchasing desk is based in South Florida.

For Tice sites we quote two ways when it helps: a single number for the scope as it stands, and a line-by-line itemization showing what the switchgear, the transformers, the busway and the cable each contribute. Some teams need the lump sum to move an approval; others need the detail for their asset records. You can have both.

Plate 03

What drives the number

We do not quote high and renegotiate on the dock, which is the complaint we hear most often about this trade. If what our crew finds in Tice matches what you described, the written price is the price we pay. If it does not — breakers already pulled, windings cut, a different model than the photo — we show you exactly which line changed and why.

Offer inputs
InputDetail
ConditionWorking, retired, water-damaged, or already dismantled
SupportAre breakers and parts still available for this line-up?
CopperWindings, bus bar and cable weight
AccessRigging path, crane need, dock reality at the Tice site
FreightI-95, I-75, I-4 and the Turnpike

Plate 04

Safety and documentation

If your Tice facility runs permits — hot work, confined space, elevated work, site orientation, background checks — tell us at the quote stage and we build the time into the schedule rather than asking for an extension later. Our people are used to refinery, hospital and utility permitting cultures.

Paper you receive

Certificate of insurance before we mobilize, a written itemized offer, a signed bill of sale, and load documentation for every trailer. If your compliance team needs something specific, ask before we schedule.

Plate 06

Tice questions

How do you handle transformer oil in Tice?

Oil is tested, drained and manifested through licensed handlers, and you receive the documentation with your paperwork. PCB-suspect units go under a separate waste profile. Nothing is left on your pad in Tice and nothing gets dumped — the handling cost is already in the offer.

When do we get paid?

Before the equipment leaves your Tice dock. Wire, company check or cashier's check, whichever your accounting group prefers. On large phased projects we pay per load as it ships rather than holding everything until the end.

What if the equipment is old or has no test records?

We still quote it. Records raise the number — a NETA test report on a breaker or a transformer is the single document that most improves what we can pay — but their absence disqualifies nothing. We price Tice equipment on what our technicians and the replacement market say it is worth.

Are you insured to work inside our Tice facility?

Yes. We carry general liability, auto, workers' compensation and umbrella coverage, and we issue a certificate naming your entity as additional insured before crews mobilize to Tice. We also complete vendor onboarding, background checks and site-specific safety orientation on request.

Can you work nights, weekends or during a shutdown in Tice?

Regularly. Most electrical removals happen outside production hours because that is when circuits can be released. Night, weekend, holiday and turnaround windows in Tice are normal scheduling for us, not a premium service.

What happens to the equipment after you buy it?

Serviceable gear is tested, reconditioned where needed and resold as replacement equipment — that resale is what funds your offer. What cannot go back into service is dismantled for copper, aluminum and steel recovery through permitted processors, with regulated fractions documented.

Form 1 — Request for Offer

Get a Written Offer

Send the asset list, or just describe what is in the room. We come back the same business day with a written, itemized offer.

Faster: call or text 954-740-1983
Email an asset list to electricalequipmentbuyers@gmail.com
Mon–Sat, 7am–7pm ET. We never resell your contact information.

Electrical equipment in Tice?

Photos of the nameplates are enough to start. Written offer the same business day.

954-740-1983

Mon–Sat, 7am–7pm ET · Tice, FL

Get a Written Offer