Serving Old Jefferson and the surrounding metro
Industrial Electrical Equipment Buyers Serving Old Jefferson, LA
Buying electrical equipment out of a live Old Jefferson building is a different job from buying it out of a warehouse. Electrical rooms have door widths, freight elevators have weight limits, hospitals and process plants have loads that cannot blink, and someone has to own the sequence. We survey first, write the sequence into the offer, then execute it.
Louisiana · statewide- Location
- Old Jefferson, LA
- State
- Louisiana
- Utilities
- Entergy Louisiana, Cleco, SWEPCO
- Offer
- Same business day
- Payment
- Before load-out
- Phone
- 954-740-1983
Plate 01
Buying electrical equipment in Old Jefferson
Old Jefferson sits in Louisiana, where Entergy Louisiana, Cleco, SWEPCO feed the load and I-10, I-12, I-20 and I-49 carry the freight. Both facts land in your number: a site near those corridors costs us less to service and the saving shows up in the offer rather than our margin. New Orleans, Baton Rouge, Shreveport and Lafayette are regular stops, and Old Jefferson work routes with them.
For Old Jefferson sites we quote two ways when it helps: a single number for the scope as it stands, and a line-by-line itemization showing what the switchgear, the transformers, the busway and the cable each contribute. Some teams need the lump sum to move an approval; others need the detail for their asset records. You can have both.
Plate 02
What we buy in Old Jefferson
Fourteen categories. We buy every one of them at Old Jefferson sites.
Electrical Switchgear
Low and medium voltage, indoor and outdoor
480 V – 38 kV, up to 5,000 AGenerators
Standby, prime and mobile sets
100 kW – 3 MW diesel and gasTransformers
Pad-mount, dry-type, substation, unit
75 kVA – 50 MVABus Plugs
Fusible switch and circuit-breaker plugs
30 A – 1,200 A fusible and breakerBus Duct & Busway
Feeder and plug-in, copper and aluminum
225 A – 5,000 A runsPanelboards & Switchboards
Panelboards, switchboards, distribution
100 A – 4,000 AWire & Cable
Copper and aluminum, new and reclaimed
#12 AWG – 1,000 MCMLoad Banks
Resistive and reactive, portable and permanent
100 kW – 3 MW resistiveCircuit Breakers
Molded case, insulated case, air, vacuum
15 A – 6,000 A framesMotor Control Centers
Low and medium voltage MCCs
MCC line-ups, buckets, VFD sectionsSubstations
Up to 138 kV primary
Complete unit and station substationsTransfer Switches
Automatic, manual, bypass-isolation
100 A – 4,000 A ATSCapacitors & Power Quality
Fixed and automatic capacitor banks
50 kVAR – 10 MVARComplete Plant Lots
One deal, one crew, one number
Whole-facility electrical scopePlate 03
What drives the number
Transformer oil is the item sellers in Old Jefferson worry about most, and fairly so. We test it, drain it, manifest it through licensed handlers and hand you the documentation. PCB-suspect units are handled under their own waste profile. The cost of that handling is already inside the offer, so nothing surprises you after the fact.
| Input | Detail |
|---|---|
| Condition | Working, retired, water-damaged, or already dismantled |
| Support | Are breakers and parts still available for this line-up? |
| Copper | Windings, bus bar and cable weight |
| Access | Rigging path, crane need, dock reality at the Old Jefferson site |
| Freight | I-10, I-12, I-20 and I-49 |
Plate 04
Safety and documentation
Safety is scope, not a brochure page. Crews working in Old Jefferson operate to NFPA 70E for arc-flash boundaries and PPE, follow OSHA 1910.147 lockout and tagout with our own locks and written procedures, and hold a daily job safety analysis before the first bolt turns. We do not energize, test or operate your equipment — isolation is verified with your electrician before we touch anything.
Paper you receive
Certificate of insurance before we mobilize, a written itemized offer, a signed bill of sale, and load documentation for every trailer. If your compliance team needs something specific, ask before we schedule.
Plate 05
Nearby cities and buyer desks
Other Louisiana locations we buy electrical equipment in:
Plate 06
Old Jefferson questions
How fast can you get to a Old Jefferson site?
Written offers go out the same business day in nearly every case. After acceptance, typical mobilization to Old Jefferson is a few business days for a straightforward removal and one to two weeks for a full plant scope that needs phasing, rigging plans or utility coordination.
Do we have to disconnect the equipment before you arrive?
No. We handle removal. Your electrician or the utility performs the final isolation and we verify it; from there our crews lock out, cut and cap cable at the gland, unbolt the sections, skate them out and load them. If the Old Jefferson room is still partly live we phase the work.
How do you handle transformer oil in Old Jefferson?
Oil is tested, drained and manifested through licensed handlers, and you receive the documentation with your paperwork. PCB-suspect units go under a separate waste profile. Nothing is left on your pad in Old Jefferson and nothing gets dumped — the handling cost is already in the offer.
When do we get paid?
Before the equipment leaves your Old Jefferson dock. Wire, company check or cashier's check, whichever your accounting group prefers. On large phased projects we pay per load as it ships rather than holding everything until the end.
What if the equipment is old or has no test records?
We still quote it. Records raise the number — a NETA test report on a breaker or a transformer is the single document that most improves what we can pay — but their absence disqualifies nothing. We price Old Jefferson equipment on what our technicians and the replacement market say it is worth.
Are you insured to work inside our Old Jefferson facility?
Yes. We carry general liability, auto, workers' compensation and umbrella coverage, and we issue a certificate naming your entity as additional insured before crews mobilize to Old Jefferson. We also complete vendor onboarding, background checks and site-specific safety orientation on request.
Form 1 — Request for Offer
Get a Written Offer
Send the asset list, or just describe what is in the room. We come back the same business day with a written, itemized offer.
Faster: call or text 954-740-1983
Email an asset list to electricalequipmentbuyers@gmail.com
Mon–Sat, 7am–7pm ET. We never resell your contact information.
Electrical equipment in Old Jefferson?
Photos of the nameplates are enough to start. Written offer the same business day.