Mukilteo, WA · Electrical Transformer Buyers
Electrical Transformer Buyers in Mukilteo, WA
We purchase transformers throughout Mukilteo and the surrounding Washington market. That includes equipment still energized and scheduled for replacement, equipment already isolated after a shutdown, and whole electrical rooms coming out of a building change. We buy it and we remove it — one offer, one crew, one certificate of insurance.
Serving Mukilteo and metro- Location
- Mukilteo, WA
- Desk
- Electrical Transformer Buyers
- Ratings
- 75 kVA – 50 MVA, oil-filled and dry-ty
- Offer
- Same business day
- Payment
- Before load-out
- Phone
- 954-740-1983
Plate 01
Transformers buyers serving Mukilteo
Our Washington routing runs along I-5, I-90, I-405 and SR-167, which keeps crew and trailer cost predictable for Mukilteo projects. Coordination with Puget Sound Energy, Seattle City Light, Avista, Grant County PUD on clearances, metering removal and final disconnect is part of the scope, not a change order.
Documentation travels with the job: a certificate of insurance naming your entity, a W-9, a signed purchase agreement itemizing each asset and its price, oil or PCB manifests where applicable, and weight tickets or a bill of lading for what leaves the Mukilteo site.
| Item | Detail |
|---|---|
| Ratings | 75 kVA – 50 MVA, oil-filled and dry-type |
| Scope | Pad-mount, dry-type, cast coil, substation |
| Nameplates | ABB, General Electric, Square D, Eaton, Cooper, Howard, Federal Pacific, Siemens, Waukesha, Kuhlman, Westinghouse, Delta Star, Pennsylvania Transformer, Hammond, Acme |
| Condition | Working, retired, water-damaged or already dismantled |
| Minimum | One section, one unit, or a whole plant lot |
Plate 02
What we take out of Mukilteo sites
Liquid-filled pad-mount and station class
Oil-filled pad-mount and pole-mount units, loop-feed and radial, unit substations with their primary switching and secondary sections, and station-class power transformers with tap changers, radiators and conservators. Oil is tested for PCB content before anything moves, and the manifests come with your paperwork.
Dry-type and cast coil
Ventilated dry-type and cast-coil units from 15 kVA through 5 MVA, including 480 V to 208 V step-downs, K-rated units specified for harmonic loads, and drive isolation transformers. Dry-types move easily, resell quickly and generally carry a strong number relative to their weight.
Washington specifics
Aerospace, aluminum and food processing operations plus Bonneville-territory utility upgrades put large switchgear, rectifier transformers and MV cable on the market, and Puget Sound port access helps on export loads.
Plate 03
Nearby and related
Mukilteo routes with these nearby Washington sites:
Plate 04
Mukilteo questions
Do you provide documentation for surplus property or audit records?
Yes. Itemized purchase agreements, weight tickets, bills of lading, oil disposal manifests and recycling documentation are standard on Mukilteo purchases. Public agencies and audited facilities get the paperwork their process requires without having to ask twice.
Do you actually buy electrical equipment in Mukilteo, or just broker it?
We buy it. Industrial Electrical Buyer is the purchaser of record — we fund the purchase, send our own crews to Mukilteo to disconnect and load, and take title when the equipment leaves your dock. There is no third party behind us waiting to approve the price.
What is the smallest job you will take in Mukilteo?
A single transformer, one switchgear section, a pallet of bus plugs or a few boxes of breakers is worth a call. Because we route crews across Washington continuously, small Mukilteo pickups usually get added to an existing run rather than priced as a dedicated trip.
How fast can you get to a Mukilteo site?
Written offers go out the same business day in nearly every case. After acceptance, typical mobilization to Mukilteo is a few business days for a straightforward removal and one to two weeks for a full plant scope that needs phasing, rigging plans or utility coordination.
Do we have to disconnect the equipment before you arrive?
No. We handle removal. Your electrician or the utility performs the final isolation and we verify it; from there our crews lock out, cut and cap cable at the gland, unbolt the sections, skate them out and load them. If the Mukilteo room is still partly live we phase the work.
Form 1 — Request for Offer
Get a Written Offer
Send the asset list, or just describe what is in the room. We come back the same business day with a written, itemized offer.
Faster: call or text 954-740-1983
Email an asset list to electricalequipmentbuyers@gmail.com
Mon–Sat, 7am–7pm ET. We never resell your contact information.
Transformers in Mukilteo?
One call, one written offer, one crew. Payment before the trailer leaves.