Franklin Farm, VA · Electrical Transformer Buyers
Franklin Farm, VA Electrical Transformer Buyers
Our Virginia desk quotes transformers out of Franklin Farm sites weekly — single items, spares-room clean-outs and complete plant scopes. Send what you have, in whatever form you have it, and the written offer comes back the same business day in a format purchasing can act on.
Serving Franklin Farm and metro- Location
- Franklin Farm, VA
- Desk
- Electrical Transformer Buyers
- Ratings
- 75 kVA – 50 MVA, oil-filled and dry-ty
- Offer
- Same business day
- Payment
- Before load-out
- Phone
- 954-740-1983
Plate 01
Transformers buyers serving Franklin Farm
Our Virginia routing runs along I-95, I-66, I-495, the Dulles Toll Road and I-64, which keeps crew and trailer cost predictable for Franklin Farm projects. Coordination with Dominion Energy Virginia, Appalachian Power, NOVEC on clearances, metering removal and final disconnect is part of the scope, not a change order.
Documentation travels with the job: a certificate of insurance naming your entity, a W-9, a signed purchase agreement itemizing each asset and its price, oil or PCB manifests where applicable, and weight tickets or a bill of lading for what leaves the Franklin Farm site.
| Item | Detail |
|---|---|
| Ratings | 75 kVA – 50 MVA, oil-filled and dry-type |
| Scope | Pad-mount, dry-type, cast coil, substation |
| Nameplates | ABB, General Electric, Square D, Eaton, Cooper, Howard, Federal Pacific, Siemens, Waukesha, Kuhlman, Westinghouse, Delta Star, Pennsylvania Transformer, Hammond, Acme |
| Condition | Working, retired, water-damaged or already dismantled |
| Minimum | One section, one unit, or a whole plant lot |
Plate 02
What we take out of Franklin Farm sites
Liquid-filled pad-mount and station class
Oil-filled pad-mount and pole-mount units, loop-feed and radial, unit substations with their primary switching and secondary sections, and station-class power transformers with tap changers, radiators and conservators. Oil is tested for PCB content before anything moves, and the manifests come with your paperwork.
Dry-type and cast coil
Ventilated dry-type and cast-coil units from 15 kVA through 5 MVA, including 480 V to 208 V step-downs, K-rated units specified for harmonic loads, and drive isolation transformers. Dry-types move easily, resell quickly and generally carry a strong number relative to their weight.
Virginia specifics
Northern Virginia construction and data facility work generates switchgear, busway and generator volume, while Hampton Roads shipyards and southern Virginia plant closures add heavy MV equipment.
Plate 03
Nearby and related
Nearby Virginia coverage — crews serving Franklin Farm also run to:
Plate 04
Franklin Farm questions
How do you handle transformer oil in Franklin Farm?
Oil is tested, drained and manifested through licensed handlers, and you receive the documentation with your paperwork. PCB-suspect units go under a separate waste profile. Nothing is left on your pad in Franklin Farm and nothing gets dumped — the handling cost is already in the offer.
When do we get paid?
Before the equipment leaves your Franklin Farm dock. Wire, company check or cashier's check, whichever your accounting group prefers. On large phased projects we pay per load as it ships rather than holding everything until the end.
What if the equipment is old or has no test records?
We still quote it. Records raise the number — a NETA test report on a breaker or a transformer is the single document that most improves what we can pay — but their absence disqualifies nothing. We price Franklin Farm equipment on what our technicians and the replacement market say it is worth.
Are you insured to work inside our Franklin Farm facility?
Yes. We carry general liability, auto, workers' compensation and umbrella coverage, and we issue a certificate naming your entity as additional insured before crews mobilize to Franklin Farm. We also complete vendor onboarding, background checks and site-specific safety orientation on request.
Can you work nights, weekends or during a shutdown in Franklin Farm?
Regularly. Most electrical removals happen outside production hours because that is when circuits can be released. Night, weekend, holiday and turnaround windows in Franklin Farm are normal scheduling for us, not a premium service.
Form 1 — Request for Offer
Get a Written Offer
Send the asset list, or just describe what is in the room. We come back the same business day with a written, itemized offer.
Faster: call or text 954-740-1983
Email an asset list to electricalequipmentbuyers@gmail.com
Mon–Sat, 7am–7pm ET. We never resell your contact information.
Transformers in Franklin Farm?
One call, one written offer, one crew. Payment before the trailer leaves.