Skip to content

Reno, NV · Electrical Switchgear Buyers

Reno, NV Electrical Switchgear Buyers

Retired switchgear in Reno is usually worth more than assumed. A large share of what gets sent to a yard as scrap actually resells into service, and the difference between those two numbers is frequently significant. We will tell you honestly which category yours falls into before you commit to anything.

Electrical Switchgear Buyers removal in Reno, NVServing Reno and metro
Location
Reno, NV
Desk
Electrical Switchgear Buyers
Ratings
480 V – 38 kV, up to 5,000 A
Offer
Same business day
Payment
Before load-out
Phone
954-740-1983

Plate 01

Switchgear buyers serving Reno

Our Nevada routing runs along I-15, I-80 and US-95, which keeps crew and trailer cost predictable for Reno projects. Coordination with NV Energy, Valley Electric Association on clearances, metering removal and final disconnect is part of the scope, not a change order.

If the Reno equipment is still carrying load we phase it — dead sections and spares first, distribution as circuits are released, the main line-up on the final clearance. The phasing is written into the offer so nobody improvises in an energized room at two in the morning.

Equipment we price without hesitation
ItemDetail
Ratings480 V – 38 kV, up to 5,000 A
ScopeMetal-clad, metal-enclosed, drawout and fixed
NameplatesSquare D, Schneider Electric, Eaton, Cutler-Hammer, General Electric, Siemens, ABB, Allis-Chalmers, Westinghouse, Federal Pacific, Powell, Zenith, Russelectric
ConditionWorking, retired, water-damaged or already dismantled
MinimumOne section, one unit, or a whole plant lot

Plate 02

What we take out of Reno sites

Medium-voltage metal-clad line-ups

Complete 4.16 kV, 13.8 kV and 38 kV metal-clad structures with their vacuum or air-magnetic breakers still racked in, main-tie-main arrangements, incoming line and metering cubicles, relay and protection sections, and outdoor walk-in and non-walk-in enclosures. Current-production vacuum breakers are the single strongest value driver in this category.

Low-voltage switchgear and switchboards

480 V and 600 V drawout switchgear, group-mounted and individually-mounted switchboards, main breaker and main lug sections, distribution sections with feeder breakers, and service-entrance equipment with utility metering. Square D Power-Style, GE AKD, Eaton Magnum and Siemens line-ups all move well.

Nevada specifics

Mining operations in the north and gaming and warehouse construction in the south create two very different markets: portable substations and trailing cable in one, switchboards and busway risers in the other.

Plate 04

Reno questions

What is the smallest job you will take in Reno?

A single transformer, one switchgear section, a pallet of bus plugs or a few boxes of breakers is worth a call. Because we route crews across Nevada continuously, small Reno pickups usually get added to an existing run rather than priced as a dedicated trip.

How fast can you get to a Reno site?

Written offers go out the same business day in nearly every case. After acceptance, typical mobilization to Reno is a few business days for a straightforward removal and one to two weeks for a full plant scope that needs phasing, rigging plans or utility coordination.

Do we have to disconnect the equipment before you arrive?

No. We handle removal. Your electrician or the utility performs the final isolation and we verify it; from there our crews lock out, cut and cap cable at the gland, unbolt the sections, skate them out and load them. If the Reno room is still partly live we phase the work.

How do you handle transformer oil in Reno?

Oil is tested, drained and manifested through licensed handlers, and you receive the documentation with your paperwork. PCB-suspect units go under a separate waste profile. Nothing is left on your pad in Reno and nothing gets dumped — the handling cost is already in the offer.

When do we get paid?

Before the equipment leaves your Reno dock. Wire, company check or cashier's check, whichever your accounting group prefers. On large phased projects we pay per load as it ships rather than holding everything until the end.

Form 1 — Request for Offer

Get a Written Offer

Send the asset list, or just describe what is in the room. We come back the same business day with a written, itemized offer.

Faster: call or text 954-740-1983
Email an asset list to electricalequipmentbuyers@gmail.com
Mon–Sat, 7am–7pm ET. We never resell your contact information.

Switchgear in Reno?

One call, one written offer, one crew. Payment before the trailer leaves.

954-740-1983

Mon–Sat, 7am–7pm ET · Reno, NV and statewide

Get a Written Offer