Skip to content

Hurricane, UT · Electrical Switchgear Buyers

Hurricane, UT Electrical Switchgear Buyers

Retired switchgear in Hurricane is usually worth more than assumed. A large share of what gets sent to a yard as scrap actually resells into service, and the difference between those two numbers is frequently significant. We will tell you honestly which category yours falls into before you commit to anything.

Electrical Switchgear Buyers removal in Hurricane, UTServing Hurricane and metro
Location
Hurricane, UT
Desk
Electrical Switchgear Buyers
Ratings
480 V – 38 kV, up to 5,000 A
Offer
Same business day
Payment
Before load-out
Phone
954-740-1983

Plate 01

Switchgear buyers serving Hurricane

Hurricane sits in Utah, where Rocky Mountain Power, Provo Power, Murray City Power feed the load and I-15, I-80 and I-215 carry the freight. Sites near those corridors cost us less to service, and that shows up in your offer rather than in our margin. Salt Lake City, Provo, West Jordan and Ogden are routine stops and Hurricane work routes with them.

If the Hurricane equipment is still carrying load we phase it — dead sections and spares first, distribution as circuits are released, the main line-up on the final clearance. The phasing is written into the offer so nobody improvises in an energized room at two in the morning.

Equipment we price without hesitation
ItemDetail
Ratings480 V – 38 kV, up to 5,000 A
ScopeMetal-clad, metal-enclosed, drawout and fixed
NameplatesSquare D, Schneider Electric, Eaton, Cutler-Hammer, General Electric, Siemens, ABB, Allis-Chalmers, Westinghouse, Federal Pacific, Powell, Zenith, Russelectric
ConditionWorking, retired, water-damaged or already dismantled
MinimumOne section, one unit, or a whole plant lot

Plate 02

What we take out of Hurricane sites

Medium-voltage metal-clad line-ups

Complete 4.16 kV, 13.8 kV and 38 kV metal-clad structures with their vacuum or air-magnetic breakers still racked in, main-tie-main arrangements, incoming line and metering cubicles, relay and protection sections, and outdoor walk-in and non-walk-in enclosures. Current-production vacuum breakers are the single strongest value driver in this category.

Low-voltage switchgear and switchboards

480 V and 600 V drawout switchgear, group-mounted and individually-mounted switchboards, main breaker and main lug sections, distribution sections with feeder breakers, and service-entrance equipment with utility metering. Square D Power-Style, GE AKD, Eaton Magnum and Siemens line-ups all move well.

Utah specifics

Mining and smelting along the Wasatch Front and steel and chemical operations south of Salt Lake produce MV switchgear, large drives and portable substations.

Plate 04

Hurricane questions

What is the smallest job you will take in Hurricane?

A single transformer, one switchgear section, a pallet of bus plugs or a few boxes of breakers is worth a call. Because we route crews across Utah continuously, small Hurricane pickups usually get added to an existing run rather than priced as a dedicated trip.

How fast can you get to a Hurricane site?

Written offers go out the same business day in nearly every case. After acceptance, typical mobilization to Hurricane is a few business days for a straightforward removal and one to two weeks for a full plant scope that needs phasing, rigging plans or utility coordination.

Do we have to disconnect the equipment before you arrive?

No. We handle removal. Your electrician or the utility performs the final isolation and we verify it; from there our crews lock out, cut and cap cable at the gland, unbolt the sections, skate them out and load them. If the Hurricane room is still partly live we phase the work.

How do you handle transformer oil in Hurricane?

Oil is tested, drained and manifested through licensed handlers, and you receive the documentation with your paperwork. PCB-suspect units go under a separate waste profile. Nothing is left on your pad in Hurricane and nothing gets dumped — the handling cost is already in the offer.

When do we get paid?

Before the equipment leaves your Hurricane dock. Wire, company check or cashier's check, whichever your accounting group prefers. On large phased projects we pay per load as it ships rather than holding everything until the end.

Form 1 — Request for Offer

Get a Written Offer

Send the asset list, or just describe what is in the room. We come back the same business day with a written, itemized offer.

Faster: call or text 954-740-1983
Email an asset list to electricalequipmentbuyers@gmail.com
Mon–Sat, 7am–7pm ET. We never resell your contact information.

Switchgear in Hurricane?

One call, one written offer, one crew. Payment before the trailer leaves.

954-740-1983

Mon–Sat, 7am–7pm ET · Hurricane, UT and statewide

Get a Written Offer